viernes, 4 de junio de 2010

How to build a building

Land verification/checking: strength properties and charasteristics of the land, as well as the depth are analised


Earth- works and trench works: the land is prepared


Foundation: shoes are built. When land is less resistant, reinforced concrete slabs are built. It is verydeep piles are used.Sorted water discharge are built


Frame constructions: frame is hold on reinforced concrete or steel piles. Over piles and walls, trusses and forged are placed


Lifting enclosures: enclosures are the walls which cover the outer building


Facilities placemenet: gas, heat and cold water disposal are placed


Finishing: plaster, floors, … are placed